October 10, 2016

Overcoming Multi-Site Electrical Deployment Hurdles: White Paper

Multi-site electrical projects have significantly more issues and challenges associated with them than single-site projects. The ability to successfully manage these challenges is essential in maintaining […]
May 12, 2016

Dedicated Circuit vs. an Isolated Ground Circuit

A dedicated circuit is intended to power only one device or one “point of use” outlet(s).    A dedicated circuit has a continuous conductor run from the […]
March 24, 2016

3 Electrical Grounding Issues That Negatively Impact System Reliability

Grounding is one of the most important aspects of your facility’s electrical wiring due to the safety and equipment damage risks associated with improper grounding.   […]
March 4, 2016

The Future of Fiber Optics

  America’s telecom firms are phasing out of old copper lines and installing high-speed fiber optics. According to The Washington Post, “This technological transition will enable […]
September 9, 2015

Nationwide Electrical Projects (video)

      Executing nationwide projects has never been easier. Customized Uptime Solutions, Inc. (CUSI) allows your business to deliver successful, high quality and timely projects […]
June 26, 2015

What is the Demarcation Point (demarc, DMARC)?

The demarcation point marks the point where communications facilities owned by one organization interface with that of another organization. In telephone terminology, this is the interface between […]
June 12, 2014

9 Types of Electrical Conduit

Electrical conduits refer to an electrical system used to protect and provide route of electrical wiring. Electrical conduits are made of metal, plastic, or fiber and […]